News
Recently
Contact us
Xi 'an Tap Water Second Engineering Co., Ltd
Phone:029-88622450
Email:1585475902@qq.com
Address:20 Huancheng West Road South Section, Xi 'an City
Business Development
Epidemic prevention construction both, quality and quantity guarantee production.
? ? ? ?As the nationwide epidemic is gradually brought under control, but epidemic prevention can not be relaxed, Yan Liang district's“Three supplies and one industry” water supply maintenance and renovation project is still strictly in line with the relevant documents on epidemic prevention and control, and is focusing on epidemic prevention and control, grasp the work to carry out, shoulder the responsibility, take multiple measures to ensure safe and civilized construction. Under the deployment of the project department, Epidemic Prevention and Control Points have been set up at each construction site, and special personnel have been sent to keep a daily record of the epidemic prevention and control situation of the project department personnel.
? ? ? In the first quarter, Yan Liang district, “Three for one industry” project department in the Epidemic Prevention and control efforts at the same time, the impact of the epidemic to customer service, the maximum guarantee of project progress. In order to let the public to improve the water service attitude, the project department strive to maintain production, good working environment has won the leadership and the public praise.
? ? ?Since March 2, when Yanliang District's “Three supply and one industry” water supply maintenance and renovation project resumed full operation, the construction has been conducted in a civilized manner, in strict accordance with the construction requirements, while ensuring safe construction. Up to now, there are 19 managers and 234 construction workers in each construction area, and 77% of the work has been completed.
? ? ? Actively communicate with Yanliang District power supply construction units on-site construction cooperation matters, after consultation, both sides have reached consensus. To participate in a special meeting on synchronous data organized by the supervision unit, and to give a full account of the basis, format and time of the compilation of Yan Liang's data to the data officers of the construction teams. At present, the compilation of synchronous data in various regions has started, all construction areas have begun to take up work. With the professional supervision engineer to the construction site of raw materials on-site sampling, sealing samples. Weekly regular supervision meetings, regular production meetings, inspection of the construction site, timely discovery of problems, practical solutions to ensure that safe and civilized construction in an orderly manner.
? ? ? At present, although it is in the crucial period of epidemic prevention and attack, in order to assume social responsibility and protect the water supply of one side, with the strong support of the leaders of the two companies and the technical departments, in Yanliang District, the “Three supply and one industry” project department, based on the premise of doing a good job in epidemic prevention, stood firm in its duties and worked hard to achieve the goal of “Both prevention and control”, with practical actions to silently protect the public water, with their own way to fight the epidemic to contribute to the strength.